1/1/2024 0 Comments 100 amp panel installation![]() ![]() Keep in mind that there is no need to bond Ground with Neutral in the subpanel (as they are already bonded in the main panel). ![]() The subpanel is fed-up by 2-Poles, 240V breaker at the main panel via two hot wires (L1 & L2), a Neutral wire “N” and Ground wire “G”. it provides protection against surges, electric shock and other electric faults.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |